stake out using total station

During the Queen Street closure, westbound 501 Queen streetcars would divert via Church, Richmond and York Streets while eastbound streetcars would divert via York, Adelaide and Church Streets. Its also mandatory that at least two people be on the crew. It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM). The digital theodolite, initially introduced in the late 1960s by Carl Zeiss Inc., helped to set the platform for modem field data collection and processing. There is a concern that winter conditions may adversely affect train operations on an elevated track like. Also, read: Principle of Plane Table Surveying Methods |Equipment | Error | Advantage | Limitation, Also, read: Piling for Foundation | Use of Pile Foundation | Characteristics of Pile Foundation, Also, read: Test for Compressive Strength of Brick | Water Absorption | Dimensions Test, Also, read: What Is Traversing in Surveying | Types | Method | Definition. TcpET Surveying and Setting Out using Total Station Introduction This application, installed in a pocket PC, allows the user to survey and stake out topographical data using a wide range of total stations, connected through a standard cable or through wireless Bluetooth technology. Record the horizontal and vertical angles using the viewing scope found on the theodolites side. Use the polyline to create points along that line (usually every 20-25m but depends on what you're laying out). Professionalism is something sometimes overlooked, but NOT with these guys. Schlouch Incorporated's use of Trimble Robotic Total Stations, Trimble GPS (Global Positioning System) and GPS equipped field machines ensures . It is aimed at anyone is required to use a total station for setting out or surveying on a construction site. Trimble Trimble S Series Total Station User Guide vii Trimble S Series DR 300+ The Trimble S Series DR 300+ is a CLASS 2 LASER PRODUCT The instrument contains visible and invisible laser sources Compute and tabulate curve notes to stake out the alignment from the TS to ST at full stations using a total station and the deflection-angle, total chord method. Manual errors involved in reading and recording are eliminated. Parts of a total station. Quora \The first number is thestationingthat is ending. Conventional Method Slope staking using a total station and data collector, setting out the offset and distance from the design catches and then manually slope staking from this point. Setting out curves The important features of total station are: Key-board: Control all the functions are controlled by operating key board. Then select the Model of your Total Station from the dropdown menu. Distance, gradient, difference in height between two inaccessible points using total station 14. In order to begin excavation of trenches required for a building's foundation, the builder must know the positions and levels of building lines shown on the construction plans on the ground. Doing Accurate Layout Work| Concrete Construction Magazine . Also, read: What Is Transit Theodolite | Theodolite Parts. To fully understand the use of surveying instruments, take a course from a licensed surveyor. How to use a total station for setting out pdf INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. How to Use Total Station? 1 They include a wide variety of practical, automated functions to achieve the highest degree of efficiency within the shortest period. It's a step by step guide in which you will see how to mark a. Solve surface and UG challenges with proven technologies for planning, operations, and safety. This will allow you to see your current position's station and offset on an alignment, relative to a referenced road. Switch to General Survey to take a topo shot on a known benchmark or turning point as a The LN-100 enabled us to stake-out the large number of points while still maintaining high accuracies. Queen station already has seven entrances, including some in the Toronto Eaton Centre and at the Hudson's Bay Queen Street complex, and no additional entrances are planned. The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. using total station for leveling is considered to have due accuracy, applications of the indirect leveling is gradually expanding for public works such as construction of roads, airports and cities. Step 3: Set-up the Tripod. A draft plan was ready by January 31, 2019. for instantaneous determination of a total station location working on the site, by mounting the antenna directly on top of the total station alidade; thus eliminating the need for establishing permanent horizontal control stations. Civil Simplified is the leading education provider in the field of Civil Engineering in India delivering quality services through hands-on, practical, application-oriented workshops, trainings, projects and internships. Trimble TSC3, Total Station or GNSS receiver, Trimble Access v2015.22, AutoCAD Civil 3D 2014/2016 . Stake out using total station 13. Toronto Union Train Station | Map & Adress - CANADA TRAINS Set up your Total Station and a target at least 100 meter apart. This is the September 2010 (Revision B) release of the Total Station DTM-322 Instruction Manual. Setting out levels using a DTM surface model. [ citation needed ] Profession [ edit ] Product identification The model and the serial Stake out using total station - ljx.cryptodemokrata.pl Total Station Vertical and Horizontal field check NEI, Basics Laying out Trenches and Levelling BAJR, https://youtube.com/watch?v=iRH6bOMdBq4 Use the locking knobs on the side of the theodolite to keep it aimed on the point. [71][72], KingBathurst station will be located at the intersection of King Street West and Bathurst Street. If the specified slab elevation is above or below the reference point, figure out by how much and determine where that point should be in relation to the level plane. In downtown Toronto, station stands on Front Street West on the south side of the block bordered by Bay Street and York Street. Press the Line option. Method B: Using a Level or Total Station When? 16-2, Minamikamata 2-chome, Ota-ku Tokyo 144-0035 Japan Notices USA FCC 15B Class B satisfied. Results showed that positioning accuracy of 1-3 cm was generally achieved. Mechanical and electrical construction Total stations have become the highest standard for most forms of construction layout. 4Site Office allows downloading, formatting and processing of survey data, whilst 4Site Survey links directly to your instrument for infield recording of data. The hands-on experience is invaluable in understanding the more abstract concepts associated with mathematics and instrument operation. Select . Total Stations. Leveling above a point is done no more than traditional instrument procedures. Stake out using total station. STN for station points, CB for corner The station would have six tracks passing through it, two tracks for the Ontario Line on the northwest side of the railway embankment plus four tracks for GO trains on its southeast side. A practical exercise will be conducted after the classroom training to give participants experience with the use of the Total Station and some position principles. 7. Fig.1: Example plan to be set out on the ground. INTRODUCTION This report discusses the use of the Sokkisha SET2 electronic total station for topographic surveying. The SET2 is a tacheometer, a device that can rapidly measure For Setting up INSTRUMENT SETUP & JOB the job when you know the coordinates of two points on the paper follow SURVEYING steps. [32] On November 17, 2022, Metrolinx and Infrastructure Ontario awarded the contract to Connect 6ix, a consortium including Hitachi Rail, Webuild, Transdev, IBI Group, among others, with a projected in-service date of 2031.[33]. Get the necessary materials ready (i.e. Either enter the next station/offset or pick Exit to end Template Stakeout. From setting building corners to sighting utility lines, this sophisticated instrument provides surveyors with an important time-saving tool. Total Station is the currently preferred Surveying equipment in the industry. [21], The announcement that the line would extend to a new station at Ontario Place stirred controversy, as Premier Doug Ford had spoken of transforming Ontario Place, previously a family-oriented venue, into an adult-oriented casino complex. The name for an instrument of this type was electronic tacheometer, but Hewlett-Packard introduced the name total station more than 30 years ago, along with the name immediately caught on with the profession (As per below figure No 2 & 3). Conventional Method - Slope staking using a total station and data collector, setting Previous Next. For a general check of this survey, it is going to be necessary to come back to the office and prepare the drawings utilizing appropriate software. Step 1: Gather the Survey Equipment, Stake, and Tools. Diploma in Surveying using Total Station. Then select the Model of your Total Station from the dropdown menu. Aim the laser on the instrument close to the point you want to lay out. A Metrolinx goal is to reduce congestion at Union Station by 14 percent by encouraging passengers to use the Ontario Line. Results showed that positioning accuracy of 1-3 cm was generally achieved. [72][73] A new station entrance will be built at 1 Atlantic Avenue.[38]. The most frequently used surveying instrument today is the total station (As per below figure No1). SURVEYING INSTRUMENTS SET300 SET300S SET500 SET500S SET600 SET600S Electronic Total Station Class 1 LED Product Class I LED Product OPERATORS MANUAL https://youtube.com/watch?v=iGRQqQ5UDXg Trigonometric Leveling - Heights and distance problem (Two Exercises) 4. fintroduction total station is a combination "Tune out targets" feature to ignore other distractions in the field. The Ontario Line would cross the Don River on a new bridge located on the north side of the existing rail bridge. Comprehensive technical support from our highly trained and experienced technical support team. Point number (you may want to use different point-numbers for the station points and topo points) Target height (for prism pole shots measure from the ground to the centre of the prism Code (depending on what your software does with it, e.g. The following are some of the major advantages of using total station over the conventional surveying instruments : Field work is carried out very fast. Trimble Trimble S Series Total Station User Guide v Important Information 1 Laser Safety Before using the instrument, make sure that you understand this user guide, as well as all [18] Unlike the city's design, the Ontario Line would be a "standalone" line, one that would use lighter rolling stock and shorter trainsets than the Toronto Transit Commission's existing subway lines. In conjunction with ATC, stations will have platform-edge doors for safety, also allowing riders to exit and enter trains more quickly. That is, the exact length, width, depth, and position of the foundation trenches must be marked on the ground. (Overlea Boulevard and Thorncliffe Park Drive intersect at two places within Thorncliffe Park. Total Station Dr. Maher A. El-Hallaq Lecturer of Surveying The Islamic University of Gaza Introduction. Station entrances will be located at the southwest and northeast corners of the intersection. According to Metrolinx, the new line will do more than provide relief to overcrowding on Toronto's existing subway system: it will provide new connections to the communities of Flemingdon Park and Thorncliffe Park. Quick setting of this instrument on the tripod with laser plummet, On-board area computation program to calculate the area of the field, Greater accuracy in area computation due to the possibility of taking arcs in area computation, Graphical view of land and plots and for quick visualization, Coding to perform automatic mapping. Atotal stationis an optical instrument used in modern surveying. Analog or digital tape measures are often used for measurement of smaller distances. Product identification The type and serial number of your product are indicated on The world's fastest robot for stakeout. document.getElementById( "ak_js_1" ).setAttribute( "value", ( new Date() ).getTime() ); At CivilJungle, we clarify civil engineering and publish all the happenings & news of civil engineering. Boost accuracy and speed when performing volumetric surveys, including overbreak and underbreak comparisons. When I import it to my TSC3 I do not have the option to import such files. LN-100 is effectively used for installing bases of solar panels Company YOUSUN, in Tsu, Mie, Japan, is an equipment installation construction company that specializes in general civil engineering works, as well as installation projects of water and sewer and social infrastructure equipment. The line continued northeast along Don Mills Road to terminate at Don Mills Road and Eglinton Avenue. The measurements are typically recorded by hand as they are not recorded by a computer or data collector. February 2023; January 2023; December 2022; November 2022; Tip. What are the uses of a total station in surveying? [45], South from Pape station, the line would travel roughly under Pape Avenue, emerging to the surface just north of Gerrard Street. SURVEYING INSTRUMENTS SET300 SET300S SET500 SET500S SET600 SET600S Electronic Total Station Class 1 LED Product Class I LED Product OPERATORS MANUAL Ltd. All Rights Reserved. Distance resolution is either pulsed (low precision) or phase comparison (average - 2 to t 5 millimeter(mm) accuracy). The northeastern terminus of the Ontario Line would be Science Centre station at Don Mills Road and Eglinton Avenue. STEPS. Inspecting the EDM of the total station 23 Instrument errors in the total station 24 Simple surveying tasks 26 Aligning from the mid-point 26 Measuring slopes 27 Measuring right-angles 28 Applications programs 29 Calculating areas 29 Staking out 30 Remote heights 31 Tie distances 32 Free-station surveys 33 The applications programs available 34 This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3 . ta. [citation needed]. It is probably the most critical step in the entire construction process. The line would jog south to Overlea Boulevard and then jog west on the north side of that street on an elevated structure. + Measurement using CL or CL and CR (circle left & circle . Quit out of Survey 29. Passengers will be able to access rail services from either the station's southwest or northeast entrance as well as from the adjacent bus terminal. (The rail corridor has three tracks with provision for a fourth. Repeatability results showed, however, that cm-level differences in coordinate Adjust the total station where necessary. Lets take a look at the steps involved to properly set up and level the Trimble Total Station. Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Setting-Out Points Using the Total Station Interface in As-Built for AutoCAD Last updated Save as PDF Share Setting-out with As-Built Setting-out Points if Control Points are Available Setting-out Points if Control Points are Not Available Setting-out Axes (Batter Board) Safer, smarter, and more efficient mining. This infor-mation and the GNSS data are either post-processed at the survey office or calculated in real-time on site. Press F4 (Start). [71] The station building design will feature heritage attributes by retaining the faade of buildings to be demolished for station construction. To fully understand the use of surveying instruments, take a course from a licensed surveyor. As of June2021[update], Metrolinx had not indicated the location of entrances and exits for this station. Set up the prism at the point you want to measure from where the total station is located. [69] The affected trees were planted during World War II. 3. Mostsurvey instrumentsscrew onto a tripod when inuse. MAGNET Field: Backsight Set Up using 2 known points with Total Station . Otherwise, use the following settings to create your own setting and to save it. 50 mm s 1, 200 mm s 1, and 500 mm s 1.For these measurements, the TS was placed in the same line as the AB line (Fig. A traditional plumb bob provides this type of check if utilized in ideal conditions. 4. Staking out with a Total Station - University of Washington They shouldnt be used for observations of the sun, unless special filters, like the Troelofs prism, are utilized. See More. From US$ 22 /night Select. With the aid of trigonometry, the distances and angles may be utilized to calculate the real positions (x, y, and z or northing,) of surveyed points in total terms. Select the method that you want to use to stake out the point. It may be challenging to fit the Ontario Line along GO Transit's. The station is at the western of the two intersections.) June 3, 2022 . View on map 900 yd from City Center 800 yd from Union Station. This contract will include design, construction, operation and ongoing maintenance of: On June 2, 2020, Infrastructure Ontario (IO) and Metrolinx issued an RFQ for the southern portion, marking the first phase of procurement for the Ontario Line. Spread out the tripod legs evenly, about two to three feet for each leg, and center it over your benchmark stake. [7][8] As of November2022[update], the estimated cost for the 15.6-kilometre (9.7mi) line was CA$17 to $19billion with an estimated completion in 2031. Reflectorless accuracies arent as good as prism accuracies given this variability of the reflecting terrain, and can, therefore, might not be suitable for more accurate surveys like FEMA first floor elevation certifications. History of construction surveying. In the meantime, archeologists were allowed on site to document any historical findings. It combines the functions of a theodolite with that of a transit level and electronic distance meter (EDM).. ATheodolite is a instrument for measuring both horizontal and vertical angles, as used in triangulation networks. This process is very useful for people who stakeout from a . Decades of experience automating mine surveying plus proven results make NSS the ideal partner for Hexagon in our efforts to serve Underground customers in the US and Canada. Step 4: Attach the Tribrach and Coarse Level the Tripod Over the Benchmark. A total station is an optical instrument commonly used inconstruction, surveying and civil engineering. As of June2021[update], Metrolinx has not indicated the location of entrances and exits for this station. Purchase Congratulations on the purchase of a Leica TS11/TS15. Tweet Schlouch Incorporated has surveyors on staff which eliminates delays in getting projects started and keeps the projects on schedule with timely stakeout and field information. [50], In 2019, Metrolinx was considering a means to link Exhibition station to Ontario Place to the south. [19] Members of Toronto City Council expressed their concerns that the new line would set back the delivery of rapid transit and potentially waste money the city had already spent on the Relief Line's design. Once the area has been mapped out, you can use the total station to perform a task called a stake out. How To Use A Total Station | Survey Equipment - EngineerSupply Metrolinx expects the Ontario Line connection at Pape station will reduce rush-hour congestion at BloorYonge station by 22 percent. NSS Canada Completes Successful MOSS Implementation at Jaguar Mining Inc. in Brazil, High Tech Hardhat Being Developed in Sudbury Will Make Mining Safer CTV News. Setting out by total station To use a total station for setting out, it must be levelled and then centred over a control point in the same way as for a theodolite. Stake-out without coordinates data! | Positioning | TOPCON After crossing the river, the line would pass the GO Transit Don Yard before descending into a tunnel just east of Cherry Street. [22][51] By using driverless trains with automatic train control (ATC), Metrolinx expects the line to be as frequent as the existing heavy rail lines despite using smaller, lighter trains. This Apps helps Land Surveyors and Civil Engineers to measure and collect topography survey data by connecting users Android phone/tablet to a total station by using bluetooth or a usb-serial adapter cable. Setting Out How To Use A Total Station Stakeout Program Step By Step Guide On Marking A Point. [28], In October 2019, Tory and Ford reached a tentative deal in which the city would endorse the line and the TTC's subway network would not be taken over by the provincial government. F4 . What is Setting Out/Stake out? - civilsimplified.com Parts of a total station. We are committed to being everywhere our customers need us to be and authorized resellers, such as NSS Canada, are invaluable in helping us to fulfill that commitment. Metrolinx hired Schabas in December 2018 to lead a team to transform the Relief Line plans into the Ontario Line. Dan berikut fitur-fitur standar Electronic Total Station untuk pekerjaan stake out yaitu ; Stake out berdasarkan HA-HD, yaitu stake out berdasarkan pada besaran sudut horizontal dan jarak datar Stake out berdasarkan koordinat (X, Y, Z), yaitu menentukan posisi suatu titik dilapangan berdasrkan data koordinat. . Then shoot the laser at the reflector with SEARCH by hitting the F1 key. Here is how to use a total station for this type of action: Position the device at a known point by setting the horizontal circle. Total station set up. 1. Once the area has been mapped out, you can use the total station to perform a task called a stake out. There is also a future proposal to extend streetcar service south along Broadview Avenue into the Port Lands in the vicinity of East Harbour station. Find out What is a Total Station? eames replica lounge chair review. Press the "Yes" button to continue the process using the coordinates on the screen for your total station. The next number is the beginningstationnumber. 2.Initially, an AB line was performed with three different speeds, i.e. 1. Total Station and Automatic Level; however may over look the importance of the tripod, prisms and staffs employed in accurately measuring and setting out. Various techniques and instruments are used for this process of setting out. Atotal stationis an opticalsurveying instrument that uses electronics to calculate angles and distances. 1 How to Set Up Builder to Gain a Known Station 16 1.1 Set Up Anywhere Based on Given Control Line 16 1.2 Set Up over Control Line 18 1.3 Set Up Anywhere with Given Coordinates 20 1.4 Set Up over One Known Point with Second Known Point 24 1.5 Set Up Using Nails from Profile Boards 28. Consequently, Union Station is Via Rail's busiest and most visited station by far. A data collector and software must be purchased separately--a $1,500 to $4,000 additional cost. Follow the LinkedIn page LinkedIn: https://www.linkedin.com/company/sitenghttps://www.linkedin.com/in/greg-stepien-7346ab183Subscribe: https://www.youtube.com/c/SITENG?sub_confirmation=1 EVERY GOOD CIVIL SITE ENGINEER MUST HAVE - watch the VID https://youtu.be/4X-nwn-J-wo - items I use and recommend SAFETY BOOTS-choose your size https://amzn.to/3NfjUCJ https://www.screwfix.com/p/dewalt-phoenix-safety-boots-tan-size-9/7001vTAPE MEASURE https://amzn.to/3xQ3cEf https://amzn.to/3xZ9ykMTAPE HOLDER https://amzn.to/3NzLDOV https://ffx.co.uk/product/Get/Makita-E-05278-088381566780-Tape-Measure-Holder CALCULATOR - sometimes you can find them half price in Supermarkets https://amzn.to/3u2hHE6DRAWING FOLDER https://amzn.to/3NqYoeA https://amzn.to/39OUNZP NOTEBOOK - get whatever really to take some notes https://amzn.to/3HQkbLxPENCIL - 0.7mm - good price, but for this colour https://amzn.to/3OlvwW3PENCIL - 2mm https://amzn.to/3QHVIffJOINER'S PENCIL https://amzn.to/3xRIaFlTIPP-EX - these are the best I used https://amzn.to/3QNrKGHPERMANENT MARKERS https://amzn.to/3ykpcZvCHALK LINE https://amzn.to/3A0aUOYFEW EXTRAS I USE TOO SMALL SPIRIT LEVEL - you can always borrow from a Chippie if needed https://amzn.to/3OEXs79KNIFE https://amzn.to/3HQKUrl GLASSES - Despite you will get safety glasses, on some sites theyre really low quality and I dont want to get my sight worse using them. veklius, post: 335559, member: 10448 wrote: Hi, I was wondering if someone could help me with surface stakeout for trimble access. Angle Distance Stakeout Use known angle and distance to do angle distance stakeout Coordinate Measurement This program can record the detail information of angle . SITENG - Setting Out #7 \"Stakeout\" In today's video I am showing how to use the Stakeout program using a Total Station. The Total station is designed for measuring of slant distances, horizontal and vertical angles and elevations in topographic and geodetic works, tachometric surveys, as well as for solution of application geodetic tasks. Refer to 6 Safety Directions for further informa- tion. With this device, one can determine angles and distances from the instrument to the points to be surveyed. Total Stations Weebly This study aims to: (1) develop the concept of instructional media based on total station animation video which is used to measure building stake out; (2) developing interactive media designs; (3) due diligence of interactive media; and (4) dissemination of interactive media. Connections to the 504 King and 511 Bathurst streetcars will be available on the surface. Manual Total Stations It was necessary to read the horizontal and vertical angles manually in this type of instrument. The section between Queen/Sherbourne and Gerrard stations would come to the surface and mostly follow a railway right-of-way instead of being tunnelled. Refinements to existing technology are the classes of servo-driven and robotic optical total stations. [10], .mw-parser-output .RMbox{box-shadow:0 2px 2px 0 rgba(0,0,0,.14),0 1px 5px 0 rgba(0,0,0,.12),0 3px 1px -2px rgba(0,0,0,.2)}.mw-parser-output .RMinline{float:none;width:100%;margin:0;border:none}.mw-parser-output table.routemap{padding:0;border:0;border-collapse:collapse;background:transparent;white-space:nowrap;line-height:1.2;margin:auto}.mw-parser-output table.routemap .RMcollapse{margin:0;border-collapse:collapse;vertical-align:middle}.mw-parser-output table.routemap .RMreplace{margin:0;border-collapse:collapse;vertical-align:middle;position:absolute;bottom:0}.mw-parser-output table.routemap .RMsi{display:inline;font-size:90%}.mw-parser-output table.routemap .RMl1{padding:0 3px;text-align:left}.mw-parser-output table.routemap .RMr1{padding:0 3px;text-align:right}.mw-parser-output table.routemap .RMl{text-align:right}.mw-parser-output table.routemap .RMr{text-align:left}.mw-parser-output table.routemap .RMl4{padding:0 3px 0 0;text-align:left}.mw-parser-output table.routemap .RMr4{padding:0 0 0 3px;text-align:right}.mw-parser-output table.routemap>tbody>tr{line-height:1}.mw-parser-output table.routemap>tbody>tr>td,.mw-parser-output table.RMcollapse>tbody>tr>td,.mw-parser-output table.RMreplace>tbody>tr>td{padding:0;width:auto;vertical-align:middle;text-align:center}.mw-parser-output .RMir>div{display:inline-block;vertical-align:middle;padding:0;height:20px;min-height:20px}.mw-parser-output .RMir img{height:initial!important;max-width:initial!important}.mw-parser-output .RMir .RMov{position:relative}.mw-parser-output .RMir .RMov .RMic,.mw-parser-output .RMir .RMov .RMtx{position:absolute;left:0;top:0;padding:0}.mw-parser-output .RMir .RMtx{line-height:20px;height:20px;min-height:20px;vertical-align:middle;text-align:center}.mw-parser-output .RMir .RMsp{height:20px;min-height:20px}.mw-parser-output .RMir .RMtx>abbr,.mw-parser-output .RMir .RMtx>div{line-height:.975;display:inline-block;vertical-align:middle}.mw-parser-output .RMir .RMts{font-size:90%;transform:scaleX(.89)}.mw-parser-output .RMir .RMf_{height:5px;min-height:5px;width:20px;min-width:20px}.mw-parser-output .RMir .RMfm{height:100%;min-height:100%;width:4px;min-width:4px;margin:0 auto}.mw-parser-output .RMir .RMo{width:2.5px;min-width:2.5px}.mw-parser-output .RMir .RMc{width:5px;min-width:5px}.mw-parser-output .RMir .RMoc{width:7.5px;min-width:7.5px}.mw-parser-output .RMir .RMd{width:10px;min-width:10px}.mw-parser-output .RMir .RMod{width:12.5px;min-width:12.5px}.mw-parser-output .RMir .RMcd{width:15px;min-width:15px}.mw-parser-output .RMir .RMocd{width:17.5px;min-width:17.5px}.mw-parser-output .RMir .RM_{width:20px;min-width:20px}.mw-parser-output .RMir .RM_o{width:22.5px;min-width:22.5px}.mw-parser-output .RMir .RM_c{width:25px;min-width:25px}.mw-parser-output .RMir .RM_oc{width:27.5px;min-width:27.5px}.mw-parser-output .RMir .RM_d{width:30px;min-width:30px}.mw-parser-output .RMir .RM_od{width:32.5px;min-width:32.5px}.mw-parser-output .RMir .RM_cd{width:35px;min-width:35px}.mw-parser-output .RMir .RM_ocd{width:37.5px;min-width:37.5px}.mw-parser-output .RMir .RMb{width:40px;min-width:40px}.mw-parser-output .RMir .RMcb{width:45px;min-width:45px}.mw-parser-output .RMir .RMdb{width:50px;min-width:50px}.mw-parser-output .RMir .RMcdb{width:55px;min-width:55px}.mw-parser-output .RMir .RM_b{width:60px;min-width:60px}.mw-parser-output .RMir .RM_cb{width:65px;min-width:65px}.mw-parser-output .RMir .RM_db{width:70px;min-width:70px}.mw-parser-output .RMir .RM_cdb{width:75px;min-width:75px}.mw-parser-output .RMir .RMs{width:80px;min-width:80px}.mw-parser-output .RMir .RMds{width:90px;min-width:90px}.mw-parser-output .RMir .RM_s{width:100px;min-width:100px}.mw-parser-output .RMir .RM_ds{width:110px;min-width:110px}.mw-parser-output .RMir .RMbs{width:120px;min-width:120px}.mw-parser-output .RMir .RMdbs{width:130px;min-width:130px}.mw-parser-output .RMir .RM_bs{width:140px;min-width:140px}.mw-parser-output .RMir .RM_dbs{width:150px;min-width:150px}.mw-parser-output .RMir .RMw{width:160px;min-width:160px}.mw-parser-output .RMir .RM_w{width:180px;min-width:180px}.mw-parser-output .RMir .RMbw{width:200px;min-width:200px}.mw-parser-output .RMir .RM_bw{width:220px;min-width:220px}.mw-parser-output .RMir .RMsw{width:240px;min-width:240px}.mw-parser-output .RMir .RM_sw{width:260px;min-width:260px}.mw-parser-output .RMir .RMbsw{width:280px;min-width:280px}.mw-parser-output .RMir .RM_bsw{width:300px;min-width:300px}, Plans for an eastwest downtown subway line date back to the early 20th century, most of which ran along Queen Street.

Florida Department Of Financial Services My Profile, Which Of The Following Is True Of Job Analysis?, Articles S

stake out using total station